Starting with digging out the new basement accomodations (30 skip loads!). The New basement area now consists of
a small
new living area, a
new bathroom with a toilet, a
new utility room, and a cupboard for the hot water cylinder.
Starting with the repositioning of gas and electric meters and new gas piping throughout.
New electrics have been installed in the basement. To the front of the property double glazed windows to the new living area.
The utility room includes concealed underfloor pumping area for drainage.
Solid oak flooring throughout basement.
For access there has been a
bespoke staircase installed with ballisters and handrail.
Kitchen refurbishment
New kitchen area on ground floor included the knocking down of a wall and a complete refurb including installation of a new
heating system throughout the whole house, complete fitting of benchmark cupboards. Install of double gazing windows within
kitchen. New Vailant gas boiler for central heating and hot water. New ceiling and plastered walls.
solid oak flooring throughout the whole of the ground floor. All new plumbing installed.
Front garden landscaping
A small
low maintenance front garden designed and constructed. This has been completed in
black limestone slabs throughout.